SAP2000, ETABS, and PLAXIS are built for the sealed, certified answer — hours of model setup, real licensing cost, desktop-installed. GroundTruth is built for the moment before that: geometry and soil in, a transparent, formula-traceable foundation estimate out, in minutes, in a browser, free to try. Every formula shown, not hidden — and stated plainly where it stops and a licensed engineer's own judgment has to start.
Bored friction / end-bearing piled raft, piles socketed into bedrock or dense stratum
Diaphragm (slurry) wall, nominal thickness 1.1 m.
| Item | Qty | Unit | Rate | Low | High |
|---|---|---|---|---|---|
| Bulk excavation | 12,000 | m³ | ₱850 | ₱10,200,000 | ₱10,200,000 |
| Retaining wall concrete | 1,540 | m³ | ₱17,500 | ₱26,950,000 | ₱26,950,000 |
| Raft + piles + basement slabs concrete | 8,673 | m³ | ₱9,200 | ₱79,791,254 | ₱79,791,254 |
| Seismic reinforcing steel | 1634.1–2451.1 | tons | ₱78,000 | ₱127,457,770 | ₱191,186,655 |
| Substructure total | ₱244,399,024 | ₱308,127,909 | |||
₱436,423,024 – ₱567,543,909
Total structure concrete 21,013 m³ · rebar 2822.1–4503.1 tons. Excludes MEP, finishes, isolation bearings, mobilization, and contingency. Full breakdown in Advanced Mode → Cost Estimate (BOQ).