CONCEPTUAL / SCREENING-LEVEL TOOL — NOT FOR CONSTRUCTION — LICENSED PE OF RECORD REQUIRED
GroundTruth.
The 10-minute pre-feasibility read, not the final design

SAP2000, ETABS, and PLAXIS are built for the sealed, certified answer — hours of model setup, real licensing cost, desktop-installed. GroundTruth is built for the moment before that: geometry and soil in, a transparent, formula-traceable foundation estimate out, in minutes, in a browser, free to try. Every formula shown, not hidden — and stated plainly where it stops and a licensed engineer's own judgment has to start.

The 10-minute read: geometry in, foundation system + BOQ + total cost out. No install, no license, nothing SAP2000/ETABS ask you to set up first.

Site & Building Parameters

SITE: Metro Manila, PH (West Valley Fault)SDS 1.05g · SD1 1.36g
GRADE20 STOREYS ABOVE GRADEMAT / RAFT 2 m132 PILES · Ø1.2 m · L=38 mEXC. DEPTH 10 m RAFT / RETAINING WALL PILE
Recommended foundation system

Bored friction / end-bearing piled raft, piles socketed into bedrock or dense stratum

Recommended earth retention system

Diaphragm (slurry) wall, nominal thickness 1.1 m.

Substructure concrete
10,213
Substructure rebar
1634.12451.1
tons
Excavation depth
10
m
Piles
132
Ø1.2m × 38m

Bill of Quantities — Substructure (PHP)

ItemQtyUnitRateLowHigh
Bulk excavation12,00085010,200,00010,200,000
Retaining wall concrete1,54017,50026,950,00026,950,000
Raft + piles + basement slabs concrete8,6739,20079,791,25479,791,254
Seismic reinforcing steel1634.12451.1tons78,000127,457,770191,186,655
Substructure total244,399,024308,127,909
Total Project Cost — Estimated (substructure + superstructure, PHP)

436,423,024567,543,909

Total structure concrete 21,013 m³ · rebar 2822.14503.1 tons. Excludes MEP, finishes, isolation bearings, mobilization, and contingency. Full breakdown in Advanced Mode → Cost Estimate (BOQ).